facebook Twitter Linke in youtube

13316809242/15816897019
59911926@qq.com/sales@goldenfuturehk.com

News

Understand industry news

Home >  News>

Points to note before and after the installation of high bay lights

Time:2021-07-19 Views:0

In the process of installing high bay lights, what are the main points of attention in the whole installation process? Let\'s take a look at the relevant instructions below.


High bay lights are classified as industrial electronic products, so they also need to be installed in designated locations. Before installation, it is necessary to check the integrity of the high bay lights and the completeness of the accessories. The wire on the industrial and mining lamp can pass through the drill hole and the wire behind the lamp can be fixed with a wire clip, and the fixing must be strong. When installing high bay lights, it is necessary to require the installation personnel to hold a professional electrician license, so as to prevent the installation errors from damaging the high bay lights.


After the high bay light installation is completed, a power-on test is required. If a single high bay light fails to light up, it is necessary to troubleshoot the circuit or high bay light problem. After ensuring that all high bay lights are normally lit, the high bay light installation operation is considered to be completed. It is necessary to ensure that the power cord of the industrial and mining lamp has a sufficient length, not to be subjected to the tension or tangential force of the pneumatic ball valve, to prevent excessive tension when installing the connection of the industrial and mining lamp, do not make the connection knot, and pay attention to the difference in the output connection. Do not mix with other lamps.